About the project
Mubadala Petroleum pursues oil and gas exploration and production in 12 countries across the eastern hemisphere. The company builds on the UAE’s hydrocarbons expertise to develop, manage and operate projects distinguished by the highest technical and safety standards. Its aim is to generate strong financial returns and contribute to diversity and security of supply in meeting the UAE’s growing energy demand.
ISG were appointed by Mubadala as their fit out contractor for their office located in Sowwah Square, Tower 3, levels 27, 28 & 29.
Mubadala wanted to achieve a contemporary state of the art office combined with traditional touches in keeping with the local and surrounding area. Throughout the three floors there is a high level of quality and multiple finishes which included, stone, marble and hard wood flooring, vinyl, wallpaper, stretch and aluminium ceilings, fabric and leather paneling. The main conference room together with all the meeting rooms and emergency rooms are linked by audio visual, LCD screens, video conferencing and IT equipment.
ISG faced two main challenges; the first was a client with a directive aggressive programme. This was to meet the needs of their existing office lease agreement. This was achieved with careful planning. The second was stakeholder lead design changes throughout. ISG utilized their close working relationship with AEDAS to coordinate a phased handover and successful move in.